LT Aquatic Consulting Ltd
Home
About us
Services
Gallery
Contact
LT Aquatic Consulting Ltd
Home
About us
Services
Gallery
Contact
More
  • Home
  • About us
  • Services
  • Gallery
  • Contact
  • Home
  • About us
  • Services
  • Gallery
  • Contact

Our services

Existing Pools

Non-Instrusive Surveys

Sustainability Assessment

Non-Instrusive Surveys

A visual inspection of your current systems and the provision of a detailed report, highlighting the condition of each component. Non-intrusive surveys do not require pool shut down.

Intrusive Surveys

Sustainability Assessment

Non-Instrusive Surveys

We offer a range of more intrusive surveys, where we physically test components to provide a more robust assessment of the operational capabilities and expected life cycle. 

Sustainability Assessment

Sustainability Assessment

Sustainability Assessment

Pools are an expensive commodity to operate. In view of this, we can carry out a full assessment of your systems and report on the current energy efficiency and provide recommendations for improvements. 

New Pools

RIBA Stage 2 - Concept Design. LOD 100

RIBA Stage 2 - Concept Design. LOD 100

RIBA Stage 2 - Concept Design. LOD 100

We can advise on the size, geometry and functionality of your swimming pool, to meet the design brief and more importantly, to meet the requirements of the intended bathers.


  • Pool layout options and profiles
  • Bather profiles and pool usage programme
  • Basic spacial planning layouts
  • Basic design parameters
  • Area schedules

RIBA Stage 3 - Developed Design LOD 200

RIBA Stage 2 - Concept Design. LOD 100

RIBA Stage 2 - Concept Design. LOD 100

The building layout and surrounding infrastructure is influenced significantly by the swimming pool systems. Plant spaces, maintenance access strategies and pool construction processes will be defined in this stage.


  • Stage 3 report
  • Calculations and data tables
  • General layout drawings
  • Key structural and sub-structural interfaces
  • Finalised pool profiles
  • Sustainability solutions

RIBA Stage 4 - Technical Design LOD 300

RIBA Stage 2 - Concept Design. LOD 100

RIBA Stage 4 - Technical Design LOD 300

Fully integrating the swimming pool technology with the architectural design, structural design, mechanical and electrical services for the building.


  • Detailed calculations
  • Schematic drawings
  • Technical specifications containing all equipment manufacturers.
  • Revit models of all systems
  • Detailed arrangement drawings of all pipework and builderswork
  • Detailed arrangement drawings of all plant and plantroom builderswork
  • • Builderswork schedules
  • • Electrical load schedule
  • • Heat loss calculations & PHE Specs
  • CDM Risk Register

Get in touch

To learn more about our services or to request our assistance, please reach out.

Contact info

Subscribe

  • Home
  • About us
  • Services
  • Gallery
  • Contact

FT Aquatic Consulting Limited

Units 2-3 Bridgeside Business Centre, Lingard Lane, Bredbury, SK6 2QT

Copyright © 2024 FT Aquatic Consulting Limited - All Rights Reserved.

Powered by GoDaddy

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

DeclineAccept